Original Vietnamese content is translated by LaoDongAI

The most beautiful trillion-dong road in Bac Kan is about to reach the finish line

LAM THANH - NHỊ TIẾN (báo lao động) 09/04/2025 09:24 (GMT+7)

Bac Kan - The Bac Kan - Ba Be City route has a total length of nearly 40km, with a total investment of more than VND2,330 billion.

The project to build the Bac Kan City - Ho Ba Be route started construction at the end of November 2021. The project has a scale of grade III and grade IV mountainous roads, with a design speed of 40km/h - 60km/h.

The starting point of the project is at Km 0+000 intersecting with National Highway 3B (Km 144+324) in Song Cau Ward, Bac Kan City. The end point is at Km 39+000 in the Hua Ma Cave area (on the Quang Khe - Nam Mau road in Quang Khe commune, Ba Be district).

Tuyen duong TP Bac Kan - Ba Be co chieu dai gan 40km, tri gia hon 2.330 ti dong. Anh: Nhi Tien
The Bac Kan - Ba Be City route is nearly 40km long, worth more than VND2,330 billion. Photo: Nhi Tien

Reported by PV, the route of Bac Kan City - Ba Be Lake has basically completed. The vehicles can move from the beginning of the route to the end of the route. The winding passes, the majestic scenery of the mountains make the most beautiful route rated in Bac Kan.

Mr. Le Nam Cao (Bac Kan City) said that the route is of great significance to local people. In addition to convenient travel, speed is also a driving force for developing tourism and goods circulation in the Ba Be area.

"The road helps connect Ba Be and neighboring localities conveniently, especially in the city area. People can go back to the city during the day.

The route has many beautiful viewing locations and majestic mountains, so every time I take my family to visit Ba Be, I stop to see the scenery. This season, the rice flowers blooming brilliantly add more beauty to the road," said Mr. Cao.

According to Mr. Trieu Hong Son - an officer of the Bac Kan Province Traffic Construction Investment Project Management Board, the Bac Kan City - Ho Ba Be route is currently 98% complete. Some sections affected by natural disasters are being urgently repaired to be handed over in the second quarter of 2025.

Investing in the construction of the Bac Kan City - Ho Ba Be route helps synchronize traffic infrastructure, promoting economic and social development. At the same time, it will create momentum for tourism development in the Ba Be Lake area, shortening the travel distance from 4 hours to 1 hour.

Some images recorded on the route:

Tuyen duong da hoan thanh tren 98%. Anh: Nhi Tien
The route is over 98% complete. Photo: Nhi Tien
Cac phuong tien da co the luu thong tren toan tuyen. Anh: Nhi Tien
Vehicles can now travel on the entire route. Photo: Nhi Tien
Phong canh nui non hung vi giup cung duong duoc danh gia dep bac nhat tinh Bac Kan. Anh: Nhi Tien
The majestic mountain scenery helps the road to be considered the most beautiful in Bac Kan province. Photo: Nhi Tien
Duong co quy mo duong cap III, cap IV mien nui, van toc thiet ke 40km/h - 60km/h. Anh: Nhi Tien
The road has a scale of grade III and grade IV mountainous roads, with a design speed of 40km/h - 60km/h. Photo: Nhi Tien
Tuyen duong duoc xay dung giup rut ngan quang duong di chuyen tu TP Bac Kan di ho Ba Be. Anh: Nhi Tien
The road is built to help shorten the travel distance from Bac Kan city to Ba Be lake. Photo: Nhi Tien

Read the original here

Same category