Original Vietnamese content is translated by LaoDongAI

Hanoi spends more than 500 billion VND to build a wastewater treatment plant in Son Tay town

khánh an (báo lao động) 11/04/2025 09:17 (GMT+7)

Hanoi - The city invested more than 500 billion VND to build a Son Tay wastewater collection system and treatment plant.

The Hanoi People's Committee has just issued a decision approving the project to invest in the construction of a wastewater collection system and treatment plant in Son Tay town.

According to the decision, the project's goal is to build a wastewater treatment system for 7/15 inner-city wards of Son Tay town, synchronously about 400 hectares.

The project includes a network of main sewers, spillways, sewers, and centralized wastewater treatment stations as a basis for building a completely separate wastewater drainage system, and after-treatment wastewater meets permitted standards before being discharged into the environment. Ensure the development capacity, expand the connection of the drainage system of Son Tay basin according to the Hanoi drainage plan to 2030 and vision to 2050.

The City People's Committee assigned the Management Board of Investment Projects for Construction of Technical Infrastructure and Agriculture as the investor with a total investment of nearly 501 billion VND, implemented in 2024 - 2027. The project is a technical infrastructure project of Group B, level II and the term of use is not less than 50 years.

The investor is responsible before the law for the accuracy of the volume and cost; the results of calculating the structure and legality of the approval dossier; the capacity of organizations and individuals to conduct surveys and establish projects. At the same time, be responsible for researching, reviewing the technical infrastructure system of the area, updating the technical infrastructure connection plan to ensure savings, efficiency, economic - technical optimization, ensuring the ability to operate synchronously between the technical infrastructure inside and outside the project.

The People's Committee of Son Tay Town organizes the implementation of site clearance for the Investment Project to build a Son Tay wastewater collection system and treatment plant, Son Tay Town according to regulations to ensure site conditions for the Investor to implement the Project according to the approved schedule.

Read the original here

Same category